Skip to content

How long does it take to build a website? What slows it down and how to get online fast

· 5 min read · CLICKO

Last updated:

The stages of a build, typical timelines by type of site, what delays most projects (rarely the code) and how to get online fast without cutting what matters.

Typical timelines by type of site

TypeTypical timeWhat stretches it
Landing page1 to 2 weeksSeveral versions for ads, connection to a CRM or newsletter
Company site of 5 to 8 pages3 to 6 weeksCopy from scratch, a photo shoot, many people approving
Site with many pages or two languages6 to 10 weeksTranslations, moving old content and redirects
E-shop6 to 12 weeksNumber of products, payments, shipping, connection to an ERP or invoicing
Site with features, such as bookings or a client area2 to 4 months or moreEach feature is a small app that needs design and testing

These timelines are indicative and assume that copy, photos and decisions arrive on time. The exact timeline for your site goes in the proposal, together with what we need from you and when.

The stages of a build

  1. Brief and proposal: what you do, for whom and what the site has to do. It takes a few days, depending on how quickly we answer each other.
  2. Structure and copy: which pages, what each one says and which words your customers search for. This is usually where most time is lost.
  3. Design: the home page and one typical page first. The rest follow the same style.
  4. Build: the site is built, made fast on mobile, and forms and measurement are set up.
  5. Testing and fixes: on phones, browsers and speed, with one combined list of changes per round.
  6. Launch: connecting the domain, Search Console, sitemap, and redirects from the old site if there is one.

What delays a site, and how to avoid it

DelayHow to avoid it
The copy has not been writtenWrite rough notes, in bullet points, about what you do and what customers ask you. They get worked into copy faster than you think
There are no photosStart shooting now with your phone, in daylight: your work, your space, your team
Decisions change halfwaySettle the pages and features before design. Anything new goes into phase two
Many people approveOne person on your side decides
Scattered feedbackOne list with every change per round, not ten messages in three apps
Nobody knows the domain loginFind out now where the domain is registered and who has access
Moving from an old siteA list of the old pages and redirects ready before launch. See A new website without losing Google

How to get online fast

The fastest site is the one that starts small. A first version with a home page, your main services and contact goes live much sooner than a full site, and gets filled in afterwards. Google needs from a few days to a few weeks to crawl a new site anyway (Google Search Central, December 2025), so every week you gain at launch counts.

  • Cut the number of pages, not the quality: fewer pages, built properly.
  • Move features to phase two: bookings, a client area and a second language can be added later without rebuilding anything, if the site is set up properly.
  • Prepare the material before the build starts: then build time is really build time.
  • Answer quickly: an approval that waits a week is a week on the timeline.

If you need customers from Google in the first week, the site alone is not enough: see SEO or Google Ads.

What to have ready before you start

0 of 10

Our brief asks when you want the site ready. Tell us and we will tell you plainly what fits by then. See website design.

Frequently asked questions

Can a website be built in one week?

A landing page or a very small site, yes, if the copy, the photos and the domain are ready and approvals come quickly. A full company site with copy from scratch usually takes a few weeks.

What delays a build the most?

Almost always the content: copy that has not been written, missing photos and approvals that are waiting. Design and code are rarely the problem.

How long after launch will people find me on Google?

When someone searches your name, usually within a few weeks. For general searches, such as "accountant Patras", it takes months and ongoing work. See Why isn't my website showing up on Google.

Does a fast site mean a sloppy site?

No, if you cut the number of pages and not the foundations. A few pages, fast, set up properly for Google and in your name, are a better start than many pages that took months.

Do I need a new domain for a new site?

No. The same domain is connected to the new site on launch day, and the change shows everywhere within a few hours. You only need access to the account where it is registered, so find it early.

Got something similar in mind?

Tell us what you want to build and we will reply with a clear proposal.

Read next