How long does it take to build a website? What slows it down and how to get online fast
· 5 min read · CLICKO
Last updated:
The stages of a build, typical timelines by type of site, what delays most projects (rarely the code) and how to get online fast without cutting what matters.
Typical timelines by type of site
| Type | Typical time | What stretches it |
|---|---|---|
| Landing page | 1 to 2 weeks | Several versions for ads, connection to a CRM or newsletter |
| Company site of 5 to 8 pages | 3 to 6 weeks | Copy from scratch, a photo shoot, many people approving |
| Site with many pages or two languages | 6 to 10 weeks | Translations, moving old content and redirects |
| E-shop | 6 to 12 weeks | Number of products, payments, shipping, connection to an ERP or invoicing |
| Site with features, such as bookings or a client area | 2 to 4 months or more | Each feature is a small app that needs design and testing |
These timelines are indicative and assume that copy, photos and decisions arrive on time. The exact timeline for your site goes in the proposal, together with what we need from you and when.
The stages of a build
- Brief and proposal: what you do, for whom and what the site has to do. It takes a few days, depending on how quickly we answer each other.
- Structure and copy: which pages, what each one says and which words your customers search for. This is usually where most time is lost.
- Design: the home page and one typical page first. The rest follow the same style.
- Build: the site is built, made fast on mobile, and forms and measurement are set up.
- Testing and fixes: on phones, browsers and speed, with one combined list of changes per round.
- Launch: connecting the domain, Search Console, sitemap, and redirects from the old site if there is one.
What delays a site, and how to avoid it
| Delay | How to avoid it |
|---|---|
| The copy has not been written | Write rough notes, in bullet points, about what you do and what customers ask you. They get worked into copy faster than you think |
| There are no photos | Start shooting now with your phone, in daylight: your work, your space, your team |
| Decisions change halfway | Settle the pages and features before design. Anything new goes into phase two |
| Many people approve | One person on your side decides |
| Scattered feedback | One list with every change per round, not ten messages in three apps |
| Nobody knows the domain login | Find out now where the domain is registered and who has access |
| Moving from an old site | A list of the old pages and redirects ready before launch. See A new website without losing Google |
How to get online fast
The fastest site is the one that starts small. A first version with a home page, your main services and contact goes live much sooner than a full site, and gets filled in afterwards. Google needs from a few days to a few weeks to crawl a new site anyway (Google Search Central, December 2025), so every week you gain at launch counts.
- Cut the number of pages, not the quality: fewer pages, built properly.
- Move features to phase two: bookings, a client area and a second language can be added later without rebuilding anything, if the site is set up properly.
- Prepare the material before the build starts: then build time is really build time.
- Answer quickly: an approval that waits a week is a week on the timeline.
If you need customers from Google in the first week, the site alone is not enough: see SEO or Google Ads.
What to have ready before you start
0 of 10Our brief asks when you want the site ready. Tell us and we will tell you plainly what fits by then. See website design.
Frequently asked questions
Can a website be built in one week?
A landing page or a very small site, yes, if the copy, the photos and the domain are ready and approvals come quickly. A full company site with copy from scratch usually takes a few weeks.
What delays a build the most?
Almost always the content: copy that has not been written, missing photos and approvals that are waiting. Design and code are rarely the problem.
How long after launch will people find me on Google?
When someone searches your name, usually within a few weeks. For general searches, such as "accountant Patras", it takes months and ongoing work. See Why isn't my website showing up on Google.
Does a fast site mean a sloppy site?
No, if you cut the number of pages and not the foundations. A few pages, fast, set up properly for Google and in your name, are a better start than many pages that took months.
Do I need a new domain for a new site?
No. The same domain is connected to the new site on launch day, and the change shows everywhere within a few hours. You only need access to the account where it is registered, so find it early.
Got something similar in mind?
Tell us what you want to build and we will reply with a clear proposal.